SYF-1D 15A Double Pedal Foot Switch

Kinds of shell’s material for choice, such as engineering plastic,
steel panel, aluminium alloy, etc;
Metal shell use the stregenthening to reast the surfase,
bears theimpact, the wearability, thermostable;
Cable lock-in jacket is made for the cable coming out
and it iswaterproof,grease proofing;
Switch bottom is equipped with the rubber pad, for skidproof;
Widely used for control in industrial automation
equipments,transport, pressing, medical treatment, test and etc.

分类

Parameter

Additional information

Brand Name

ZJSHUYI

Origin

China

Material Body

Steel

Colour

Customizations

Rating Load

10A/250V

Operating Temperature

-10℃-+70℃

Certification

CCC, CE

Warranty

18 months

SYF-1D 15A Double Pedal Foot Switch

1.According to the difference of load and current value, rated load
should be taken note.Current value of this series is 10A and 15A;

2.When transporting and moving, pls take note of the short circuit
or open circuit may happen in internal wiring;

3.Please take note of the level of protection when used in water, oil and
bug dust.This series has protective type and unprotective type;

4.The immediate cause for broken is stress and attack, please pay attention;

5.Warning mark’Danger! High Voltage!’ and’Take note!’ remind us
pay attention to personnel safety and correctly operation.

FAQ:

1. Q: Can you provide OEM service?
A: Yes, OEM is feasible for all models.
2. Q: What’s the MOQ?
A: For testing purpose, 1 pc is ok.

3. Q: If i want to place order, what’s the payment method you accept?
A: We accept T/T, Paypal, Western union, etc.

4. Q: If i want to place order, what’s the process?
A:You can send inquiry to us by this site, or send us by email, we will reply ASAP.

5. Q:How long is the delivery time?
A:Normally, 3-15 working days, The fastest delivery within 1-3 working days.

Application:

Kinds of shell’s material for choice, such as engineering plastic, steel panel, aluminium alloy, etc.
Metal shell use the stregenthening to reast the surface, bears the impact, the wearability, thermostable.
Cable lock-in jacket is made for the cable coming out and it is waterproof, grease proofing.
Switch bottom is equipped with the rubber pad, for skidproof.
Widely used for control in industrial automation equipments, transport, pressing, medical treatment, test and etc.

Duration Estimation

Pls kindly note, it’s important to know the duration of of the whole order process.

Exist sample lead time

For the hot sale model and supplier standard model products, generally they have samples in stock, so you can require a sample quickly and easily. Send the sample request, supplier ship out the samples in 1-3 days by express, you will receive the samples in 7-30 days.

Custom sample lead time

Custom sample lead time depends on your specific requirements and products.OEM packag, such as paper box packag, it’s easy for any suppliers to do it, if you need exist product in custom packag, it takes 4-7 days will be ok.

Production lead time

It depends on the order quantity. The production lead time refers to the number of days required by the factory. After receiving the order, the entire production is completed and ready for shipment. Most of the product supply takes 15-30 days.

Shipping time

There are different shipping ways for options. Air shipping is fast but expensive, it’s a good choice for urgent orders, it only takes 7-10 days max. Sea shipping is the most economical shipping way, time is much longer than air, takes 20-30 days.

Inventory& Low MOQ Support

Inventory

20,000 square meters warehouse, plenty inventory and well managed.

One Stop Solution

Inventory includes, micro switches, limit switches, travel switches, foot switches, toggle switches, solid state relays,

Low MOQ

For retailers, we accept small orders. We thiank this is really good for you

Price Advantage

For distributors, buy in bulk can get a better price. Save purchasing costs for you.

SHIPPING POLICIES

DELIVERIES ARE ONLY MADE MONDAY THROUGH FRIDAY

is not responsible for weather delays or other carrier issues.

STANDARD SHIPPING

Standard ground transportation of inventory items takes approximately 2-7 working days. Except for national holidays, shipments are only available from Monday to Friday. The quantity of all products determines the shipping carrier.

FEDEX 2ND AND NEXT DAYAIR

FedEx 2nd and Next Day Air Orders typically ship the first business day after an order is placed.Deliveries are only made Monday through Friday. No deliveries will be made on weekends or holidays. Please note that per FedEx policy not all areas are guaranteed to receive overnight deliveries. Carriers may only count business days for 2nd day delivery dates. 

FREIGHT SHIPPING

Products are shipped by freight and usually leave the warehouse within 3-5 days. Our order volume is very large, and our warehouse is working hard to process the order as soon as possible. thank you very much for your patience. For more information about our shipping policy, please see below.

Ask For A Quick Quote

Enter your request below and send it to us, and we’l get back to you ASAP!

Please leave your message, you are our important customer!

Enter your request below and send it to us, and we’l get back to you ASAP!Send you a beautiful gift. Thanks!